When we finished logging yesterday, we had reached a depth of 3261.7 ft. This is 134.1 ft in a single day, it certainly helps when you have four people logging! Over the next couple months we'll have three people logging almost every day of the week, so we should have the preliminary logging of the first phase of drilling complete by the end of July.
After logging is complete, we stack, wrap, and strap the boxes on a pallet in this trailer so they can be brought up to the drill site and be put into storage. This stack shows the last 48 of the PQ core boxes on top of the 30 shallowest HQ boxes. My rough estimate of the weight of each pallet is ~3000 pounds (~1360 kg).
Sunday, June 30, 2013
Friday, June 28, 2013
Logged to 3127.6 feet, 177 units
Today we logged core boxes to a depth of 3127.6 ft, 209.6 ft deeper than three days ago. So far we have identified 177 lithologic units; from the expected pahoehoe, ʻaʻa, soil, ash, cinder and intrusions to surprising dune sands, sandstones, conglomerates, and glacial till deposits. Soon we'll be stacking and wrapping up another pallet of rock boxes to put into storage, and logging some of the most complex intrusions recovered from the entire first phase of drilling. I'll try and post a picture of one or both of these by early next week.
Tuesday, June 25, 2013
Logged to the bottom of the PQ section, 2918 feet
Today our logging efforts took us to the bottom of the PQ portion of the hole (3.375" diameter), 2918 ft. This is 332 ft deeper than the logging depth we reached a week ago. The logging will happen more quickly now that we're focusing on it exclusively, and everything involving the HQ core (2.625" diameter) seems a little quicker and easier. The core box on the left is the final PQ box, it contains pahoehoe with a dense flow interior (click on the picture for a larger view of the box).
Saturday, June 22, 2013
Processed to 5786 feet, the end of drilling Phase 1
Today we finished boxing up the 90 ft of core that was drilled yesterday. This is the end of the first phase of HGRP drilling. It's time for the drill crew to go on break, once they pack up all their equipment and leave the rig in good order. Over the next couple months, we'll continue to log core down here at UH Hilo, and prepare for the next phase of drilling. Blog updates will not be daily, but I will continue to update the blog regularly with project news. We expect to have some scientists who are interested in studying the core visit us during this time, and some of the preliminary studies of the groundwater and rocks are about to begin.
Thursday, June 20, 2013
Processed to 5696 feet, secondary mineral slickensides or slickenfibres
Today we boxed rock core to a depth of 5696 ft, 70 ft deeper than yesterday. The drillers actually drilled 90 ft of core, but not all of it was brought down to us because of some of the activity related to wrapping up the drilling. Tonight will be the end of the first phase of drilling this hole, I'll post the stopping depth tomorrow. Meanwhile, here's another picture of a new and interesting feature we saw in the core today:
Here Bryan is holding a piece of core (diameter 2.625") that has green to white mineralizations on a fracture surface. These minerals look just like the majority of the secondary material we're seeing in core vesicles and fractures, except that here they're striated in one direction. Considering how much of this secondary mineralization we've seen in the deeper reaches of the hole, it's surprising that we haven't seen this kind of feature until today (when we saw two examples of this). The composition of this material is certainly different from the slickensides/slickenfibres we saw shallower in the hole, but the process that formed all of them is probably the same.
Here Bryan is holding a piece of core (diameter 2.625") that has green to white mineralizations on a fracture surface. These minerals look just like the majority of the secondary material we're seeing in core vesicles and fractures, except that here they're striated in one direction. Considering how much of this secondary mineralization we've seen in the deeper reaches of the hole, it's surprising that we haven't seen this kind of feature until today (when we saw two examples of this). The composition of this material is certainly different from the slickensides/slickenfibres we saw shallower in the hole, but the process that formed all of them is probably the same.
Wednesday, June 19, 2013
Processed to 5626 feet, another sedimentary unit
Today we boxed up rock core to a depth of 5626 ft, 100 ft deeper than yesterday. At this depth, if the rock drills well, this is about the maximum possible recovery in a single day.
Above is a photo of another sedimentary unit, lately the drilling has recovered one interval of sedimentary rock each day. This unit contains two large clasts in a finer-grained matrix at its top and middle portions, and then fine sediment at its base that shows bedding and cross bedding. Note the presence of a variety of clast types in this unit, as well as green and white secondary materials.
Above is a photo of another sedimentary unit, lately the drilling has recovered one interval of sedimentary rock each day. This unit contains two large clasts in a finer-grained matrix at its top and middle portions, and then fine sediment at its base that shows bedding and cross bedding. Note the presence of a variety of clast types in this unit, as well as green and white secondary materials.
Tuesday, June 18, 2013
Processed to 5526 feet, logged to 2586 feet
A quick update on drilling and logging progress: Today we boxed rock core to a depth of 5526 ft, 70 ft deeper than yesterday. We saw more ʻaʻa today than usual, in fact it was the first time in a few days that we've seen ʻaʻa at all.
Each day when we finish boxing up the newly drilled core, we head over to the rock lab and log the core's features into the database. As of the time of this blog post, we've logged to a depth of 2586 ft; 86 ft deeper than a few days ago. Soon the first hole of the project will be finished and we'll devote all of our workdays to completing the logging of all the rock recovered from that hole.
Each day when we finish boxing up the newly drilled core, we head over to the rock lab and log the core's features into the database. As of the time of this blog post, we've logged to a depth of 2586 ft; 86 ft deeper than a few days ago. Soon the first hole of the project will be finished and we'll devote all of our workdays to completing the logging of all the rock recovered from that hole.
Subscribe to:
Posts (Atom)
